Brunelli Construction Co. (Nig.) LTD.

List of projects…

Piling and foundation works

Most of the foundations-using a large diameter bored piles-for the multistoried building that dots Lagos horizon is constructed by us. A few of our esteemed Client are: Re Insurance Corporation (N. 2,7 milion 1982 Nickson Borys & Partners), Chellarams (now WEMA Bank building N 1,35 milion 1982 James Cubit & Partners), African Continental Bank (N 1,5 milion 1978 Integrated Consultants), New Nigeria Bank (N 1,4 milion 1980-81 Mc Gregos Avani & Associates), WEMA Bank (N 1,45 milion 194-85 Osot Consultant), Trade House (N 0,75 milion 1986 Doyin Investments), Nigeria-Arab Bank Ltd. (N 2,65 milion Leecon Associates).

Brunelli has under tanek projects far and wide of the Federation a few of them are: cased pile foundations to 6 bridges along Aba-Oron & Aba Abakiliki roads in the east including the bridges (N 7 milion 1975 FMW), Federal Secretariat Phase, Ikoy (N 3,5 milion 1979 Defence Industries Cooperatives), Cased piles for railway bridge at NNPC, Kaduna (N 0,25 milion 1982 Nigerian railway corporation), bored piles for 132 KVA Trasmission towers (N 132 milion 2002 Pivot Engg. Co. Ltd), bored piles for 3 bridges for katsina State (N 49 milion 2002 Fago Rjiyali, Tsumiya-Dannakola Road), bored piles for I & II Phase construction of head office of revenue mobilization and fisical commission, Abuja (N 35 milion 2002, 2004 Federal Ministry of Finance), bored piles for Burga bridge, Bauchi State (N 35 milion 2004 Dantata Sawe).

Along the industrial front, doundations for the 40,000 tons cement silos for NISPA Cement Apapa (1976) Globspin Textile Factory, Isolo (N 1,1 milion 1988 Bhojsons), NTA Studios, Tejosho, Lagos (1997), Sugar Refinery project, Apapa (2003) & 80,00 tons cements silos, Obajana cements (N 270 milion 2004 ACC consultants) for Dangote Industries, Food processing Factory for BUA international at Rin Tincan Island (2004) to name a few, were constructed by us. We have a lot Customers using our Spun pre-cast reinforced concrete piles for various structures/project.

Diaphragm wall installation

Brunelli has extensive track record in the construction of diaphragm walls. Imo House, Lagos with two under ground floors had extensive support diaphragm walls extending to 17,5 meters below ground level. Some of the other major installation were proveded for African Continental bank, New Nigeria Bank, Nigeria Reinsurance corporation, wema bank head office, and nigeria arab bank limited. The adjusted total current valute of there projects is over 1 bilion naira.

Construction of Jetties

Jetty for Mid maritime was constructed in 1984 at a cost of N 600,000 at Tin can Island. A jetty for the naval sea school (FMW) COSTING n 750,000 was constructed at Snake Island, Lagos during 1985-86. Construction of a Ferry-jetty was carried in lagoon at Oworonsoki for Federal Urban Mass Transit Agency during 1992-93 at a cost of 12,5 milion. Some of there works are combined with shore protection works given below. All the above works used factory produced Reinforced spun concrete sheet piles.

Construction of Jetties

Jetty for Mid maritime was constructed in 1984 at a cost of N 600,000 at Tin can Island. A jetty for the naval sea school (FMW) COSTING n 750,000 was constructed at Snake Island, Lagos during 1985-86. Construction of a Ferry-jetty was carried in lagoon at Oworonsoki for Federal Urban Mass Transit Agency during 1992-93 at a cost of 12,5 milion. Some of there works are combined with shore protection works given below. All the above works used factory produced Reinforced spun concrete sheet piles.

Shore protection works

The shore protection works carried by us deploys sheet piling, cast-in.situ concrete walls and pre cast concrete sheets.
Some of our numerous projects in shore protetion are: Louis Close Victoria Island using concrete sheet piles 12 meter long, designed cantilever (N 2,3 milion 1987), Dubri Oil, Victoria Island (N 2,3 milion 1996), Pier Harbor Residence, Marinho Drive, Victoria Islandi using boulder quay wall (N 44,5 milion 2001), MALBON Ltd., Marinho Drive V.I using diaphragm walla and bored piles (N 41,6 milion 2002), Foreshore, Osborne Road, Ikoyi using 8 meter deep diaphragm wall (N21,6 milion 2003)

Dedging of Canals

Some of our dredging projects are: Akoka Channelisation scheme, Lagos, FMW 25 meter wide, 3 meter deep, 2,5 Kilometer long (N 0.95 milion 1983-84), UNILAG, Iwaya CANAL 30Mx3Mx4km long, Lagos State/FMW/UNILAG (N 1,2 milion 1984), Gbagada to bariga canal 25MX3MX3km long, Lagos state ministry of enviroment & physical planning (N 5,9 milion 1989-90), Mende-Odo-lya Alaro Canal 45Mx2M Lagos State ministry enviroment & Physical planning (N 15 milion 1992-93), Dredging of Ayeke-Achalkpo-Badagry and Bala-Okoyo Canals (N 68 milion 1994-95 World Bank project). All these projects completed a decade ago are functioning effectively.

Drainage construction

The complete drainage scheme for the prestigious National Theater Complex was constructed by Brunelli during 1974-75.
The concrete drains were constructed on piles due to the very swampy nature of the area. The total cost of the project was N 19,5 milion (US $ 29,5 milion). Other important projects are, drainage works at FESTAC Town, Lagos, Federal Housing Authority-complete concrete drains and culverts (N 9,7 milion 197-76), Concrete drains 3MX1,5MX2500M long for Federal College of education, Ojo ,Lagos Federal Ministry of Education (N 3,5 milion 1978-80), Concrete collector Drains for satellite, Town, Lagos FMW (N 3,25 milion 1981-82) Concrete collector drains at shomolu Channelisation project, Lagos state ministry of environment and Physical planning (N 3,15 milion 1982-83).

Roads and bridges

Brunelli construction had been an important player in road construction projects in the country. Old Lagos-ibadan Road, Ondo-Akure Road, Ibdan-lfe Road (in association with bartoletti) Ileolui-Ipetu Road, were all constructed by us. Of a recent we are more into construction of township roads. Few of our township project are, Festac Village, Lagos (FMH), Satellite Town, Lagos (FMW), Ondo Township Roads (Ondo state), Ikom and Badagry Barracks (Nigerian Army). We are geared to take un such projects un a cost effective way.

Water supply & treatment plants

The following water supply and treatment plants were executed by us; Construction of Bore Holes and water Treatment plant20000 litres/hour for National theater in 1975. Complete sewage system and sewage treatment plant of teachers Ikom barracks, Nigerian Army, Calabar during 1977-78.

Production of Spun concrete Sections

Our centrifugal spun concrete factory at Orile Iganmu Lagos can produce the following items with a production capacity of 150 numbers for 8 hours shift. The following table gives the techical data for widely used sections. Other sections with a varying dimensions can be manufactured.